Home
Overview
Bioscience
Healthcare
Commercial Real Estate
Construction
ASTM Phase 1 & 2 Environmental Site Assessments
Real Estate Evaluation (Property Condition Assessments)
LEED Feasibility & Costing Advisory Services
Green Construction Oversight & Monitoring
Design Review &Commissioning
Decommissioning Studies of Industrial/Lab Buildings
Asbestos, PCB & Lead Management Programs
MCP Compliance
Brownfield Studies
Construction Containment
Ambient / Perimeter Monitoring
Construction Mold Prevention Training
Risk Management Training Programs
Dispersion Modeling
Customizing the Building
Regulatory Permitting
Energy Efficiency & Monitoring Services
Design Review & Commissioning
ASHRAE 110 Fume Hood Tests & Biosafety Cabinet Testing
Maintaining Environmental Health & Safety Compliance
Regulatory Compliance Training Services
Regulatory Compliance Management Services
Indoor Air Quality Investigations
Solving / Avoiding Building Problems
IAQ & HVAC Investigations / Evaluations
Advanced Building Diagnostics & Engineering
Proactive Building Performance & IAQ Studies
Asbestos, Lead & PCB Management & Abatement Oversight Services
IAQ/HVAC Initial Response Training
Re-Commissioning for Performance Improvements
Mold Assessment & Remediation Oversight
HVAC Vulnerability Assessments
Emergency Response Services
Disaster / Emergency Recovery
Loss Mitigation
Risk Communication & Management
Mold & Moisture Assessment
Remediation Design & Management
Exposure Assessment
HAZMAT
Legionella Assessments
Sustainability
Higher Education
Legal
Insurance
K-12
Architects
Government

ASHRAE 110 Fume Hood Tests & Biosafety Cabinet Tests

ASHRAE 110 Fume Hood Testing
EH&E performs initial and periodic tests of installed fume hoods as part of the laboratory ventilation management program (in accordance of ANSI/AIHA Z9.5-2003 American National Standard for Laboratory Ventilation).

The performance of the laboratory fume hood under “AU” (as used) conditions when initially installed should include the ASHRAE 110–1995 performance test. The ASHRAE 110 test consists of four parts:

  • Small volume smoke test
  • Large volume smoke test
  • Face velocity tests
  • Tracer gas containment tests

Periodic performance tests of the face velocity measurements/grid tests and smoke visualization test are required at least on an annual basis and when repairs of a fume hood occur.

EH&E can perform the ASHRAE 110 testing and provide certification documentation for each fume hood tested.

Biosafety Cabinet Testing
EH&E will provide the necessary equipment, documentation and engineering support to perform the biosafety cabinet (BSC) testing and field verification program. The BSC management program includes:

  • Test, certify and tag BSC in accordance with the National Sanitation Foundation (NSF) Standard 49-2002 for the field certification of biological safety cabinets, Class II. Certification conducted by NSF-accredited service technicians.
  • Field certification primary physical tests (NSF Std.) include:
    • Velocity profile test
    • Work access opening airflow (face velocity)
    • HEPA filter leak test
    • Airflow smoke patterns
    • Electrical test
  • Certification documentation for each cabinet tested.
  • Assist in training on proper use of BSCs.
  • Provide assistance in troubleshooting problems with BSC equipment and contamination.
  • Monitoring proper decontamination, testing, and recertification of BSCs that have been repaired or moved to a new location.